Industry 4.0 Skillnet, one of 70 Skillnet Ireland Business Networks nationwide, and University of Galway have launched cutting-edge programmes designed to meet the evolving needs of the construction sector.
This module will cover the broad areas of building information modelling (BIM) technology, digital twinning, visualisation methods and their standard approaches within the construction sector. Digitalisation is fundamentally changing the ways in which construction teams interact. Technologies such as BIM can seamlessly monitor the materials and products delivered to the construction site, in a manner that respects the need for sustainability and traceability. Furthermore, sensors can provide the data for digital twins and their incorporation into construction elements, thus the ability to analyse and exploit the large volumes of data is required.
Furthermore, augmented reality technologies are beginning to be used for tasks such as site inspections, allowing continuous monitoring of construction process and conducting quality control checks with greater ease. Technologies such as these are fundamentally changing the way in which construction projects are managed and lead to new work processes. This module will engage with learners to ensure they are fully prepared for the potential of these new work practices. This module is a science-based approach and key tools, methods and materials will be explored.
Start date 04/11/24 until 13/01/25
As part of this module, learners will develop skills in Modern Methods of Construction (MMC), as the sector moves rapidly towards Industry 4.0. The module will cover key areas of standardisation and routes to certification, next generation rapid build systems (off-site panelised and modular construction), automation and autonomous construction. This module is a science-based approach and key tools, methods and materials will be explored.
Start date 14/01/25 end date: 10/03/25
This Level 9 Postgraduate Certificate in Modern Methods of Construction focuses on the latest advancements and sustainable practices in the construction sector. Delivered in a fully flexible format to accommodate working professionals, this one-year course offers modules in Sustainability Planning in Construction, Digital Construction Technologies and Modern Methods of Construction.
This Level 8 Specialist Diploma in Automation and Control is a fully online one-year course and offers in-depth training in automation, critical for modern construction and manufacturing sectors. The curriculum includes modules in machine design, automation, manufacturing technology and an industry-based capstone project which can be based in the student’s company and aims to assist the organisation to develop innovative practices in relation to industrial control systems, robotics and production lines.